|
Fill in the
details below and get you up to 4 Quotes from Rated Ground Works Companies in
Cork
for FREE! |
 |
1. Job Summary
|
|
2. More info and Contact Details
|
|
|
To receive up to 4 quotes from rated
Ground Works Companies in Cork
all you need to do is fill in the simple form which asks you to describe
the work you need done as well as your budget and schedule etc.
We then contact and inform the
Ground Works Companies
in our database who are available and who are willing to quote for work in Cork
The
Ground Works Companies
benefit by getting an opportunity to grow their business and you benefit
by getting up to 4 quotes for your job.
|
|
|
|
|
Recent Builder - Ground Works Jobs in Cork
|
To do depth work for whole house 11.55m x 12m.. Bantry , Cork
Concrete shed base roughly 2.5x4 Ground levelling, concrete pour for steel shed. Est size 2.5x4m. Mogeely , Cork
Concrete foundation for shed 3x3M Digging of foundation and fill g with hardcore and concrete for positioning of steel shed. Ballincollig , Cork
Groundworks Preparation for extension foundation digout and removal of materials from site prepare patio area small digger required Wilton area must be reqistere and unsured. Cork, Cork
Install approx 12 m sewage drain Installing shed at back of new build, would like option to install toilet and shower in the future. Drainage also needed for roof rain run off
It’s approx 12 m -13 meters from t. Carrigtwohill , Cork
Prepare and lay shed base Need a slab approximately 8ft 6ins x 7ft on slightly sloping ground in rear garden. Castlemartyr, Cork
Groundworks Installation of parking for 3 vehicles in front garden with a retaining 1m wall on 3 sides and remove hedge on 4th side and replace with a 2m high wall/fence plus extend front terr. Clonakilty, Cork
Concrete base for shed Concrete base for steel tech shed ..shed size 7x7 . Durrus , Cork
Concrete garden Concrete over garden to make bigger drive way. Also partially demolish wall to relocated pillar. . Cork, Cork
Steeltech shed floor concrete 3x4 Existing shed and base needs final pour and level of floor internally.. Midleton, Cork
|
|